Power Infrastructure for Musoma and Busega Water Projects
This project included the installation of 250M and 150M 11KV and 33KV overhead power lines, along with 1X315KVA 33/0.4KV and […]
This project included the installation of 250M and 150M 11KV and 33KV overhead power lines, along with 1X315KVA 33/0.4KV and […]
Under Contract No. AE/042/2022-2023/W/38, we constructed a high-tension (HT) power line to support the Bugando Chabula Water Supply Project. This
This project involved the construction of a 33KV national electric grid power line and the installation of six distribution transformers
This project involved the supply and installation of an 11/0.4KV 100KVA distribution transformer to provide stable and reliable power for