Under Contract No. AE/042/2022-2023/W/38, we constructed a high-tension (HT) power line to support the Bugando Chabula Water Supply Project. This vital infrastructure project was designed to provide a stable and efficient energy supply for the water distribution system.
By focusing on precise engineering and timely execution, we ensured the seamless integration of the HT line into the existing power grid. The success of this project highlights our expertise in delivering energy solutions that empower critical infrastructure projects.
Employer: MWAUWASA
Address: P.O Box 317, Mwanza
Role: Prime Contractor
Contact: Eng. Salim Losindilo (0756291029)
Year: 2023
